Company News -

Buoyancy selected for natural gas development in the Eastern Mediterranean

Our advanced buoyancy technology will play a key role in enhancing subsea operations and supporting offshore energy infrastructure.

image

CRP Subsea has been awarded a substantial contract from a prominent EPCI (Engineering, Procurement, Construction & Installation) company. The contract involves the supply of distributed buoyancy modules (DBMs) to a natural gas development off the Eastern Mediterranean coast.

The DBMs will be deployed on dynamic umbilical and MEG (mono-ethylene glycol) risers, which connect to a floating production, storage, and offloading (FPSO) unit positioned above operating at depths of approximately 1,800 metres. The DBMs are engineered to ensure the risers can withstand the challenging offshore environment, including wave forces, currents, and the motions of the FPSO. This is achieved using a high-capacity compliant internal clamp, that applies a controlled, uniform circumferential pressure around the riser. The clamps ensure that the DBMs remain securely in place maintaining a lazy-wave configuration.

Matt Burrows, Sales Manager, comments:

"Securing this contract is a reflection of the trust and collaboration we have built with our customer. It reinforces our commitment to delivering customised, high-quality solutions to our key customers. We look forward to strengthening this partnership further through this project and beyond.”

Production of the distributed buoyancy modules will take place at our site in Skelmersdale. The project engineering works are due to start shortly, with delivery scheduled for Q1 2026.

Product information

Distributed buoyancy modules (DBMs) are typically used between structures and a surface vessel or platform. They provide uplift generated by a two-part buoyancy element and a clamp. Our unique clamping solutions allows DBMs to be securely attached at any point along the length of a rigid or flexible pipeline or cable and ensures the modules maintain their position.

Find out more about our distributed buoyancy modules here.

Similar news
image
The latest innovations in the NjordGuard cable protection system (CPS)

Designed not just to protect, but to enable fast, efficient, and practical offshore deployment.

See more
image
Why global operators choose ContraTherm® C55

Specifying subsea insulation presents a unique set of challenges. Extreme temperatures, high hydrostatic pressures, complex geometries, and long operational lifecycles all demand materials that perform reliably in harsh environments. For global operators, reducing risk and uncertainty is critical.

See more
image
FY25 audited results for AIH (ASX:AIH) now finalised

AIS recently released its audited financial results for the 12 months ended 30 September 2025 (FY25) for Advanced Innergy Holdings Ltd, trading as AIS (ASX: AIH). All figures below are stated in Australian dollars (AUD).

See more

Share your protection challenge

Do you need to protect equipment in an extreme operating environment? Find out how AIS can help.

Get in touch