Oil & gas
Why global operators choose ContraTherm® C55
Specifying subsea insulation presents a unique set of challenges. Extreme temperatures, high hydrostatic pressures, complex geometries, and long operational lifecycles all demand materials that perform reliably in harsh environments. For global operators, reducing risk and uncertainty is critical.
Text Link
Thermal
Oil & gas
MS200 selected for major insulation scope on Ruya project offshore platforms
AIS is proud to announce its involvement in the Ruya project (Al-Shaheen Phase 3 – Batch 1), a major offshore oilfield expansion led by Qatar’s North Oil Company (NOC).
Text Link
Thermal
Oil & gas
AIS strengthens position in Brazil’s subsea insulation market with major new project award
Leveraging a proven track record and the reliable performance of ContraTherm® C25 insulation, this achievement underscores AIS' commitment to delivering solutions for the demanding offshore environment.
Text Link
Thermal
RELATED CASE STUDIES

Sizeable underdeck protection requirement? Capacity is no issue for AIS

Share:

Summary

With the capacity to manufacture and deliver MS400 on a large scale, look no further for both underdeck and LNG pipework protection.

For advanced underdeck protection, AIS' track record is unrivalled. One of the reasons for this is our capacity to take on large projects.

Indeed, we can produce thousands of linear metres of our MS400 system including all the tees, reducers, and bends for any project within a short lead time.

One example of this took place in China. Our customer required 4,500 m² of MS400 H120 panels to protect the underdecks of their LNG modules. AIS delivered and supervised application for a seamless installation on time and on budget.

MS400 has a proven track record and has been used on multiple offshore underdecks around the world for the last ten years. It was first used on the BP Clair Ridge project and saved a total of 83 tonnes of topside weight compared to the original system.

If you have a requirement for the MS400 half shell system designed for LNG pipework (which provides 60 minutes of cryogenic liquid jet release protection and 60 minutes of jet fire protection), or our MS400 lightweight underdeck protection, contact our expert team today at [email protected].

To find out more about MS400, click here.

RELATED NEWS

Want to learn more about AIS?