Building trust is at the forefront of what we do. Therefore, we are delighted to report that EDF has used ContraFlex® jackets to repair and replace jackets on valves, governors and stops in various stations for over eight years. Since every turbine is unique, our team continues to make bespoke applications to fit the customer's turbines. Furthermore, the removal and maintenance of our jackets is up to three times quicker than traditional methods - resulting in millions in cost savings for EDF.

Solution

Turbines use "superheated steam" (steam that's hotter than its vaporisation or boiling point at the absolute pressure where the temperature is measured) which may cause health and safety risks if not insulated. At AIS, we design, manufacture, and install ContraFlex® high-temperature insulation jackets so they are capable of operating at 900 °C. Therefore, they can withstand the 700 °C limit of gas turbines (GT) with ease. This is through the use of specially selected infill materials and fabrics, and staggered joints between the layers of insulation, ensuring minimal heat loss and maximum efficiency. As a result, EDF continues to trust our insulation solution.

Our track record

Typical applications include insulating intermediate pressure (IP) and high pressure (HP) turbine half joints, main boiler feed pumps (MBFP) in addition to ancillary equipment such as; stops, governors (Gov), valves and strainers including; vacuum tubes (VT) and idle control valves (ICV). The table below illustrates our continual work with EDF power plants across the UK:

Date EDF Station Description
July 2016 Hartlepool Various jackets around the reactor, and maintenance on the centre line jacket
October 2016 Heysham 2 Maintenance on centre line jackets
February 2017 Heysham 1 HP and IP Stop and Gov valves
July 2017 Dungeness B Maintenance on centre line jackets
July 2017 West Burton CCGT Maintenance on centre line jackets
January 2018 Hartlepool MBFP live steam valve and suction stage, plus various jackets around the reactor
May 2018 Heysham 2 Maintenance on centre line jackets
September 2018 Dungeness B Maintenance on centre line jackets
September 2018 Torness Replace IP top and ½ joints
March 2019 Hinkley Point B Replace IP top
June 2019 Torness Supply spare set of HP jackets for site
March 2020 Hartlepool Duplicate jackets on GT and ST (copy original OEM jackets)
March 2020 Heysham 2 unit 8 Repair / replace jackets on IP cylinder and Gov valves
April 2020 West Burton CCGT unit 2 Duplicate OEM GT and steam turbine (ST) jacket
September 2020 West Burton CCGT unit 1 Duplicate OEM GT and ST jackets
December 2020 Heysham 1 unit 1 Repair / replace jackets on IP stops and Gov valves
June 2021 West Burton CCGT unit 3 Duplicate OEM GT and ST jacket
June 2021 Heysham 2 unit 7 Repair / replace jackets on HP stops and Gov valves
December 2021 Hartlepool unit 1 Repair / replace jackets on HP and IP stops and Gov valves

Results

Our ContraFlex® jackets reduced the removal, maintenance and reinstatement schedule from seven days using traditional insulation to three. This reduction in outage time for Hartlepool and Heysham 1 provided over £5 million in cost savings. From steam leak sectioned areas to full turbine overhaul, our Thermal Insulation Engineers (TIE) are available to assist on any major turnaround/fabric maintenance campaign.